Forms are ready for concrete! All sleeves for utilities are in place, no later drilling needed. Part of the basement walls is fully above grade, and will be made from SIPs panels - structurally insulated panels.
FOUNDATION FORMS - Missing wall at the top of the photo will be build later from SIPS panels.
Comments